Fast, Split, Commercial, Advertising DC EV Charging Stations

Fast, Split, Commercial, Advertising DC EV Charging Stations

DC EV Charging Stations

DC Fast Charger Manufacturer — Power Your EV Charging Business.

 

  • 60-480kW Integrated DC + 1200kW Split DC → Full Power Coverage
  • CE/TÜV Certification | OCPP 1.6J Native | Made in China, Deployed Globally;
  • OEM/ODM Customizable | 24h Quotation Response | 2-Year warranty;
  • CCS1/CCS2/GB/T → Compatible with 4 charging standards;
  • 48h Salt Spray Test → Reliability in Extreme Environments;
  • Manufacturer-direct → Direct supply from Chinese factories;
 
Anari Energy provides DC fast chargers for global CPOs and fleet operators. Our DC EV charger offers fast, efficient charging for commercial and public use. High power output, wide compatibility, user-friendly interface, durable design, plus safety mechanisms, localization services, and professional team support.

 

 

Set A Consultation Today

DC EV Charging Stations

 

 

Comparison of Anari Energy DC Chargers

 

 

Photos
Products Vulco DC Series Pales DC Series Castor DC Series Aquila DC Series Fora DC Series
Charging Mode CCS2 & GB/T CCS2 & GB/T CCS2 & GB/T CCS2 & GB/T CCS2 & GB/T
Screen Type 10-inch HD Touch Screen 7-inch HD Touch Screen 7-inch HD Touch Screen 32"HD True Color anti-glare LCD ——
Output Power 60-480kW 60-240kW 20-40kW 20-240kW 480-1200kW
Cable Length 5m(8m and 10m optional) 5m(8m and 10m optional) 5m(8m and 10m optional) 5m(7m and 10m optional) ——
Number of Connectors 2 2 1(20kW) or 2(30-40kW) 2 6-12
IP and IK Rating IP54, IK08 IP54, IK08 IP54, IK08 IP54, IK08 IP54
Dimensions(H*W*D) 750mm *700mm *1800mm 680mm*512mm*1630mm 710mm*620mm*350mm 800mm*500mm*1880mm 1700*800*2100mm (480~800kW)
2140*820*2100mm (960~1200kW)
Certification TUV/CE —— CE CE CE or GB/T
Cooling Type Air Cooling Air Cooling Air Cooling Air Cooling Liquid Cooling&Air Cooling
Application Scenarios CPO/Fleet/Public Charging Station/Highway Service Area/Petrol Station Conversion Logistics Park / Fleet Depot Office / Business Park /Bus Depot Shopping Mall / Retail  Truck Stop/Mining

 

 
 
 
Find Your Power Level — DC Charger Selection Guide
 
Power Applicable Scenarios Recommended Products Typical Charging Time (80%)
60kW  Small/Medium Fleets, Work Parks Pales 60-240kW  40-60 min
120kW Public Charging Stations, Logistics Parks Vulco 120kW ~30 min
180kW Highway Service Areas, Busy Stations Vulco 180kW 20-25 min
240kW High-Traffic Stations, Future Reserve Vulco/Aquila 240kW 15-20 min
480kW Ultra-Fast Charging Stations, Electric Trucks Vulco 480kW 10-15 min
480-1200kW Truck Stops, Mining  Fora Split-Type Depends on Configuration
 
 

Advantages of Anari Energy's Products

  • Charging Speed

    DC fast charging shortens the charging time for EV owners, increases the utilization frequency of charger.

  • Convenience

    Rapid EV charging minimizes downtime, driving higher footfall and sales opportunities for your business.

  • Customer Attraction & Loyalty

    DC fast charging offers a competitive edge, attracting EV drivers in underserved markets and fostering customer loyalty.

  • Environmental Responsibility

    Fast charging showcases your eco-commitment, boosting brand reputation among sustainability-minded consumers.

  • Compliance & Incentives

    DC fast chargers meet green regulations and unlock incentives, future-proofing operations in evolving markets.

  • Revenue Generation

    Fast charging stations can significantly improve the turnover ratio of charging stations and accelerate the payback period.

FAQs of DC EV Charger

  • What Is DC Charging and How Does It Work?

    DC charging delivers direct current directly to an EV’s battery, bypassing the onboard AC/DC converter. This allows for significantly faster charging compared to AC charging, as the conversion happens externally in the charger. DC chargers are commonly deployed at motorway service stations, fleet depots, and high-traffic

  • What's the Best DC Charger for My Business?

    Choose based on power requirements and fleet usage:

    • 50 kW: Suitable for small to medium fleets with extended break periods.

    • 100–150 kW: Ideal for busy depots, reducing charging time to ~30 minutes.

    • 150–350 kW+: Optimal for high-use fleets and future-proofing, enabling 15–25 minute charges.
    Most modern EVs use CCS connectors; ensure compatibility during selection.

  • How Long Does DC Charging Typically Take?

    Charging time depends on charger output and vehicle acceptance rate:

    • 50 kW: 40–60 minutes to 80% SOC

    • 100–150 kW: ~30 minutes

    • 150–360 kW+: 15–25 minutes
    Charging slows beyond 80% SOC to preserve battery health.

  • What Temperature Ranges can EV Chargers Operate in?

    Our chargers maintain full functionality in extreme climates ranging from -30°C to 50°C (-22°F to 122°F), a critical feature for outdoor installations. Thermal management systems with automatic load adjustment guarantee stable performance across this spectrum, meeting global operational standards.

  • Do your DC Chargers Support V2G (Vehicle-to-Grid)?

    The current product supports OCPP 1.6J, the V2G function requires support from the OCPP 2.0.1 protocol, and Anari is currently undergoing protocol upgrade certification. You can contact sales to obtain the V2G roadmap.

  • Why is 120kW or 180kW Recommended for Highways and Fleets?

    120kW or 180kW is the current industry standard for commercial DC fast charging because:
    1. Balance of speed and cost: Charges most EVs to 80% in 20-30 minutes
    2. Grid-friendly: Doesn't require massive electrical upgrades
    3. Future-proof: Compatible with 800V architectures emerging in 2024-2025
    4. Fleet efficiency: Optimized for turnover rate at stops
    Highway deployment tips:
    - Place 4-8 ports per site
    - Include load management for multiple vehicles
    - Add amenities (restroom, café) to improve user experience

  • Should Hotels Install Level 2 or DC Fast Chargers?

    Most hotels should install both:
    Level 2 (AC) for:
    - Overnight guests (4-8 hour dwell time)
    - Spa/golf course visitors
    - Lower cost per port ($$1,000-$$3,000)
    DC Fast for:
    - Restaurant/cafe visitors (15-30 min stops)
    - Event attendees needing quick charge
    - Premium guest service differentiation
    Recommended mix: 80% Level 2 + 20% DC Fast

  • How Many EV Chargers Does a Hotel Need?

    Formula:
    Number of chargers = (Total parking spaces × EV adoption rate × Turnover factor) ÷ Charging duration factor
    Rule of thumb:
    - Boutique hotel (50 rooms): 4-6 ports (3 AC + 1-2 DC)
    - Mid-scale hotel (100 rooms): 8-12 ports (6 AC + 2-4 DC)
    - Large resort (200+ rooms): 16-24 ports (12 AC + 4-8 DC)
    Consider:
    - Local EV adoption rate
    - Nearby charging infrastructure gaps
    - Guest demographics and travel patterns

  • How to Choose a Reliable EV Charger Supplier for Hotels?

    1. ✅ OCPP 1.6J/2.0.1 certification
    2. ✅ CE/UL/TÜV certification for target market
    3. ✅ 24/7 technical support in your region
    4. ✅ Warrant: Minimum 2 years, preferably 3-5 years
    5. ✅ Reference projects in hospitality sector
    6. ✅ Spare parts availability locally
    7. ✅ Software platform compatibility with hotel PMS

  • Hotel EV Charging: Guest Convenience, Revenue and Brand Value

    Three value pillars:
    1. Guest Convenience
    - In-room notification when charging is complete
    - Mobile app for finding and reserving ports
    - Contactless payment (RFID, QR code, app)
    2. Revenue Streams
    - Direct charging fees (mark-up on electricity)
    - Partnership revenue with charging networks
    - Increased F&B/spa revenue from waiting guests
    3. Brand Value
    - ESG/sustainability positioning
    - Competitive differentiation
    - Attract eco-conscious travelers and corporate clients

  • How Many DC Chargers Does an Electric Fleet Need?

    Calculation method:
    Number of chargers = (Daily mileage ÷ Range per kWh × Battery capacity) ÷ (Charger power × Charging efficiency × Daily utilization)
    Simplified rule:
    - 1 charger per 3-5 vehicles for depot overnight charging
    - 1 charger per 2-3 vehicles for daytime opportunity charging
    - Add 20% spare capacity for maintenance/peaks
    Example: 20 electric delivery vans
    - Overnight depot: 4-7 chargers (60-120kW)
    - Daytime opportunity: 7-10 chargers (150kW)

  • Why do shopping centers need DC fast chargers?

    - Shoppers spend 30-90 minutes shopping (perfect for 20-40min charge)
    - Drivers shop more when charging vs waiting
    - Differentiates from competitors
    Deployment strategy:
    - 4-8 DC fast ports for mid-size mall
    - Position near entrances for visibility
    - Combine with retail tenant promotions
    ROI drivers:
    - Direct charging revenue
    - Increased foot traffic for retailers
    - Parking fee optimization

  • EV Charging for Office Buildings and Business Parks

    Workplace charging essentials:
    - Type: Primarily Level 2 (AC) for 8-hour stays
    - Power: 7-19kW per port
    - Management: Time-of-use pricing, employee access control
    - DC option: 1-2 DC fast ports for visitor/emergency use
    Business case:
    - Employee benefit (sustainability, cost savings)
    - Attracts EV-driving talent
    - Can generate revenue from non-employee users

  • EV Charger Load Management for Commercial Buildings

    Load management dynamically allocates available electrical capacity among connected chargers to prevent overloading.
    How it works:
    1. The building has 200kW electrical capacity
    2. 4 DC chargers connect simultaneously
    3. System allocates: 50kW each (not 150kW each)
    4. As chargers reach target SOC, power redistributes
    Benefits:
    - Avoid costly electrical upgrades
    - Maximize the number of vehicles served
    - Reduce peak demand charges
    Implementation:
    - Software-based (OCPP load management)
    - Hardware-based (power-sharing circuits)
    - Cloud-based (centralized management)

  • How to Install EV Chargers in an Underground Parking Garage?

    Key considerations:
    1. Ventilation: EV batteries can vent gases; ensure proper airflow
    2. Fire safety: Install fire suppression systems near chargers
    3. Electrical: Run conduit from main panel; consider sub-panel for charger bank
    4. Signage: Clear parking space markings and instructions
    5. Accessibility: ADA/compliant pathways to chargers
    Installation steps:
    1. Site survey and electrical assessment
    2. Permit acquisition (local building code)
    3. Civil works (conduit burial, foundation)
    4. Electrical installation (panel upgrade if needed)
    5. Charger mounting and wiring
    6. Software configuration and testing
    7. Commissioning and handover

  • How Many DC Fast Chargers Are Needed at a Highway Site?

    Planning formula:
    Number of ports = Peak hourly arrivals × Average charging duration ÷ 60 minutes
    Typical deployment:
    - Rural highway stop: 4 ports (2x150kW)
    - Major highway corridor: 8-16 ports (mix of 150kW and 360kW)
    - Truck-specific stop: 6-12 ports (240-360kW)
    Design principle: Plan for 20% utilization at peak; if you hit 80% consistently, expand.

  • How to Select a DC Charger Supplier for a National Charging Network?

    Evaluation criteria:
    1. Capacity: Can they deliver 100+ units/month?
    2. Certification: CE/UL/TÜV for all target markets
    3. OCPP compliance: Certified by OCA (Open Charge Alliance)
    4. Software platform: Compatible with your CMS/RMS
    5. Service network: Local technicians for installation/maintenance
    6. Warranty terms: 2-5 years, clear SLA for response times
    7. Reference projects: Successful national deployments
    Site visit checklist:
    - Production line capacity and automation
    - Quality control processes (aging tests, IP rating tests)
    - R&D team size and certification lab
    - Warehouse inventory for spare parts

  • What is Dynamic Load Management for Commercial EV Charging?

    Dynamic load management (DLM) optimizes power distribution across multiple chargers based on:
    - Available grid capacity
    - Real-time charging demand
    - Time-of-use electricity pricing
    - Vehicle battery state of charge
    Implementation levels:
    1. Basic: Fixed power allocation per port
    2. Advanced: Real-time power redistribution
    3. Smart: Integrated with building energy management system
    Savings potential:
    - Avoid demand charges: 10-30% on electricity bill
    - Defer grid upgrade: Save $$50,000-$$200,000
    - Optimize TOU pricing: Charge during off-peak hours

  • How to Connect DC Fast Chargers to a Charging Management Platform?

    Connection methods:
    1. OCPP over Ethernet: Wired connection to router/internet
    2. OCPP over 4G/LTE: Built-in SIM card for cellular connectivity
    3. Wi-Fi: For sites with strong wireless coverage
    Configuration steps:
    1. Network connectivity test
    2. OCPP endpoint configuration (CMS URL, charging station ID)
    3. Authentication setup (certificate-based or basic auth)
    4. Heartbeat interval configuration
    5. Transaction data mapping
    6. Remote command testing
    Best practice: Use wired Ethernet where possible; cellular as backup.

  • Commercial DC Fast Charger Installation: Electrical, Safety and Site Requirements

    Pre-installation checklist:
    1. Electrical capacity assessment (transformer size, panel capacity)
    2. Local permit acquisition (building, electrical, zoning)
    3. Site survey (parking layout, traffic flow, signage)
    4. Grounding and lightning protection design
    5. Fire suppression system plan
    Electrical requirements:
    - 150kW charger: ~200A at 480V 3-phase (North America) or ~220A at 400V 3-phase (Europe)
    - 350kW charger: ~400A at 480V or ~500A at 400V
    - Dedicated circuit breaker required
    - Surge protection device (SPD) installed
    Safety requirements:
    - IP65 rating minimum for outdoor installation
    - Emergency stop button accessible within 3 meters
    - Clear signage with operating instructions
    - ADA/compliant pathway to charger

  • Choosing Charger Power for Highway Charging Networks

    Decision framework:
    1. Traffic volume: >10,000 vehicles/day → 150kW+; <5,000/day → 50-120kW
    2. Vehicle mix: Long-haul trucks → 240kW+; Passenger cars → 150kW sufficient
    3. Dwell time: Average 20 min → 150-350kW; 40+ min → 50-120kW OK
    4. Future-proofing: Install 150-240kW now; upgrade to 360kW as 800V vehicles penetrate the market
    Recommendation: Start with 150kW dual-gun units; expand to 360kW liquid-cooled for high-traffic locations.

  • EV Charger Cable Management and Safety Requirements

    Cable best practices:
    - Use cable management arms or reels for easy access
    - Maintain 30cm clearance from ground
    - Avoid sharp bends (min bend radius 5x cable diameter)
    - Inspect cables weekly for damage
    Safety requirements:
    - Emergency stop button within 3m of charger
    - Ground fault protection (GFCI) installed
    - Clear warning signage (high voltage, charging in progress)
    - Non-slip flooring around charging area
    Maintenance checklist:
    - Weekly: Visual inspection of cables, connectors, housing
    - Monthly: Test emergency stop, check cable retraction mechanism
    - Quarterly: Torque check on electrical connections
    - Annually: Full inspection by certified electrician

  • EV Charging Management Software for Commercial DC Fast Charging Stations

    Core features to look for:
    1. Real-time monitoring: Charger status, power output, faults
    2. Remote control: Start/stop sessions, update settings
    3. Payment integration: RFID, QR code, credit card, mobile app
    4. Load management: Dynamic power allocation across ports
    5. Reporting: Usage statistics, revenue, uptime metrics
    6. Roaming: Interoperability with other charging networks
    OCPP compliance: Ensure software supports OCPP 1.6J or 2.0.1 for maximum compatibility.

  • How to Manage Charging Station Pricing and Billing?

    Pricing models:
    1. Per kWh: Most common; aligns with user cost perception
    2. Per minute: Simple but can penalize slow charging
    3. Session fee + per kWh: Covers fixed costs
    4. Time-of-use: Higher rates during peak hours
    Billing best practices:
    - Display price before charging starts
    - Send receipt via email/app after session
    - Offer subscription/membership discounts for regular users
    - Transparent pricing: no hidden fees
    Tax compliance: Ensure billing system handles VAT/GST correctly by jurisdiction.

  • EV Charging Data Management for Fleet Operators

    Key data points to track:
    - Charging sessions (time, duration, energy delivered)
    - Vehicle performance (SOC, charge rate, battery health indicators)
    - Cost analysis (energy cost, demand charges, maintenance)
    - Utilization rates (which chargers are busiest)
    - Downtime analysis (fault frequency, resolution time)
    Integration options:
    - Direct API integration with fleet management system
    - CSV/Excel export for manual analysis
    - Dashboard access via web browser

What They Say ?

  • Anari's advertising screen products have truly performed extremely well. After being put into operation, they quickly attracted many advertisers. After establishing partnerships, advertising revenue contributed 10% of the revenue to the charging stations.

    Ethan Harrison
  • The 180kW DC fast charging station is truly exceptional. Its powerful performance and advanced features have greatly impressed us. The charging speed is remarkable, enabling our car owner customers to charge their electric vehicles efficiently.

    James Cater
  • Anari's after-sales service is excellent. When my charging station needed a firmware upgrade, they quickly dispatched professional who efficiently met my needs within a few hours. They are a highly professional and dedicated Chinese team.

    Robert Jones
  • The 120kW DC charging station can still provide stable, continuous, and high-power electricity replenishment to EVs under weather conditions such as heavy rain and high temperatures, making it the most popular brand among the charging stations.

    Emma Richardson
  • Anari Energy's application is user-friendly. Their team helped us design a native-language User Interface, making it extremely user-friendly even for non-technical users. Without complex procedures, charging can be set up in just simple steps.

    John Andersen

Why Choose Anari Energy as Your DC Fast Charger Manufacturer

 

•  Cost Efficiency of Made in China (no middleman markup)
•  Global Certifications (TÜV/CE/CB, including verifiable certificates)
•  Production Capacity and Delivery Cycle
•  OEM/ODM Cases (Desensitized Existing Projects)
•  Localization after-sales Support (language/UI/technical support)

 

A DC EV Charger Guide provides essential information on how to effectively use and install DC fast chargers for electric vehicles. It covers key aspects such as selecting the right charger based on power output and compatibility with different EV models, understanding the installation requirements for various environments, and ensuring compliance with safety standards.

 

The guide also offers insights into optimizing the charging process, including tips on minimizing charging times and integrating chargers with existing infrastructure. Whether you’re setting up a public charging station or a commercial fleet operation, this guide helps you make informed decisions to ensure efficient and reliable EV charging

 

Whether your organization is a Fleet/CPO/Casstation/Parking Operator/Logistics Park, or a Bus/Truck/Shopping Mall/Public Charging Station/Highway Service Area/Commercial Building, Anari Energy's full range of DC charging station products can meet your deployment needs. Please contact our sales experts, who will provide you with professional advice on product selection, investment and return cycles, and installation and deployment.
 

Set A Consultation Today

WhatsApp

Leave a message!

Leave a message!